We are participating in the Cities Environment Reports on the Internet network
 
State of the Environment in Riga 2001
Home Page   |  About city  |   About this report  |   The CEROI network  |   FAQ  |   Search   |   Feedback   |   Links  |   Map

Water

  What is being done to solve the problems

 Within the framework of the Riga Water and Environment Project approved by the Riga City Council, municipal company " Rigas Udens" are implementing the following projects:

  • modernisation of the Daugava water treatment plant
  • reconstruction of the Daugavgriva wastewater treatment plant
  • reconstruction of the wastewater pumping station
  • reconstruction of the water and sewage system, etc.

Until now has been finished 1st phase (1997. - 2001.) of the Project. Main outputs of it are: 

  • design for ground water pumping station "Baltezers" and water intake
  • design and reconstruction of networks in the central part of the city
  • reconstruction of water treatment plant "Daugava" with installation ozonation system
  • reconstruction of aeration and sludge dewatering system at wastewater treatment plane "D augavgriva"
  • connection of 70% population to the centralized wastewater collection system
  • construction of a communications tunnel in the aquatorium of the riga free port

 The Riga City Council has granted LVL 230 000 for the installation of water meters in flats of low-income households.

 

 State environmental institutions are providing environmental monitoring within the City according to the state requirements.

  

 In 1995 Environmental Department of Riga City Council created monitoring network (16 monitoring sites) of the City to assess the inland water quality. This monitoring was into operation from 1996 to 1998. The monitoring was stopped because of financial shortages and lack of political will.

 

 

 

 Chapter Navigation
 
 Action
 

 What we can do! 

 Indicators
 
 More In...

  

   

 

This page was last updated: 2003.03.31.